Search the whole station

commercial hyperbaric chamber

Match the Chamber to Your Facility, Service Model, and Daily Workload

Choose from flexible lying chambers, hard-shell monoplace units, multi-person seated chambers, and stretcher-access configurations. Shanghai Baobang Medical Equipment Co., Ltd. manufactures MACY-PAN soft-shell and hard-shell chambers and supports OEM and ODM projects for commercial buyers.

Share your intended use, target market, planned users per session, access needs, site dimensions, and preferred pressure range. Our team will identify suitable models and prepare a configuration-based quotation.

Choose a Chamber Format Around the Service You Plan to Run

Start with the service you plan to operate, then compare chamber structure, occupancy, user position, access method, rated pressure, breathing-gas arrangement, and site requirements. These factors separate the four formats below.

Flexible lying chambers

Flexible chambers use a soft pressure boundary and can be folded when the chamber body is not in use. A lying configuration suits businesses that plan for one user per session and have a defined area for the chamber, compressor, oxygen equipment, cooling equipment, hoses, and operator access. Compare the complete system footprint and operating instructions because a foldable chamber body does not make every system component portable.

Hard-shell monoplace chambers

A hard-shell monoplace chamber accommodates one user at a time. Cylindrical lying models and upright seated models create different transfer, doorway, floor-load, and supervision requirements. Confirm the internal dimensions, entry height, user position, rated pressure, pressurizing medium, breathing-gas delivery, communication method, and emergency release procedure for the exact model.

Multi-person seated chambers

Multi-person chambers can support two or more occupants, subject to the model’s rated capacity and approved layout. They may improve scheduled capacity when a facility can consistently fill shared sessions, but a higher seat count also changes supervision, oxygen interfaces, cleaning turnaround, evacuation planning, utilities, and floor-space needs. Count users, attendants, and any in-chamber operator separately when defining capacity.

Stretcher-access chambers

A stretcher configuration can simplify horizontal transfer for a user who cannot enter a chamber independently. Review the stretcher rail, transfer height, entry clearance, rated load, restraint method, communication system, door-closing clearance, and emergency removal process before specifying the unit.

Build the Selection Brief Before You Compare Models

The fastest route to a useful quotation is a short operating brief that describes the project in measurable terms.

  1. Define the service and intended use. State whether the facility will provide a regulated medical service, a wellness or recovery service, equipment demonstrations, rentals, or distribution. This determines which product documents, authorizations, personnel, and local approvals must be checked.
  2. Set the session capacity. Record the number of users per session, sessions per day, operating days per week, expected peak periods, and whether an attendant must enter the chamber.
  3. Describe user access. Specify seated or lying use, independent entry, walk-in access, wheelchair transfer, sliding stretcher transfer, and any required doorway or threshold dimensions.
  4. Define technical requirements. Ask for normal working pressure, maximum allowable working pressure, relief settings, pressure reference, pressurizing medium, breathing-gas delivery, air and oxygen flow, communication, monitoring, and emergency controls.
  5. Measure the site. Provide delivery-path dimensions, room dimensions, door width, turning space, floor capacity, available power, ventilation, ambient conditions, fire-safety provisions, and service clearance.
  6. Identify the target market. Specify the country and state where the chamber will be imported, installed, and operated so the quotation can identify the applicable electrical version, labeling, documentation, and regulatory responsibilities.
  7. Set the commercial scope. Include quantity, finish, branding, language, requested accessories, shipping destination, installation support, training, acceptance documentation, warranty, spare parts, and required delivery date.
Send Your Selection Brief

Commercial Hyperbaric Chamber Options

Blue MACY-PAN ST701 flexible lying hyperbaric chamber with clear side window

Blue MACY-PAN 701 flexible lying chamber with a large clear side window.

MACY-PAN ST701 Portable Lying Soft Chamber

The ST701 is a single-user flexible chamber designed for a lying position. It gives commercial buyers a compact chamber-body format for facilities that can provide a dedicated operating area and external system components.

  • StructureFlexible TPU chamber
  • Capacity and positionOne user, lying
  • Pressure configurations shown for the model1.3, 1.4, or 1.5 ATA
  • Chamber size shown for the modelApproximately 88 in long × 28 in diameter
  • Custom optionsColor, logo, and selected configuration details subject to quotation
White MACY-PAN HE5000 Fort hard-shell chamber with side door and control screen

White MACY-PAN HE5000 Fort chamber with a side entry door, observation window, and external control screen.

MACY-PAN HE5000 Fort Hard-Shell Chamber

The HE5000 Fort is a stainless-steel hard-shell chamber with a face-to-face seating layout. Its upright cabin format is intended for projects that need seated occupancy and can provide the delivery path, room area, utilities, and floor capacity stated in the final installation drawing.

  • StructureHard-shell, medical-grade stainless steel
  • LayoutFace-to-face seating; confirm rated occupancy for the quoted configuration
  • Pressure specification2.0 ATA
  • External dimensionsApproximately 89 × 46 × 74 in
  • Chamber weight and floor loadConfirm against the final approved configuration and installation drawing
  • Custom optionsColor, logo, electric seat, star-effect ceiling, and ambient lighting
White MACY-PAN HE5000 hard-shell chamber with open side door and interior seats

White MACY-PAN HE5000 chamber with an open side door and visible interior seating.

MACY-PAN HE5000 Three-Person Hard-Shell Chamber — White Configuration

The HE5000 is a multi-person stainless-steel chamber available with two-seat, three-seat, bed-platform, or bench layouts. Select the interior around rated occupancy, the planned service, supervision, oxygen interfaces, and the room’s delivery and installation limits.

  • StructureHard-shell, medical-grade stainless steel
  • Available layoutsTwo seats, three seats, bed platform, or bench
  • Pressure specification2.0 ATA
  • External dimensionsApproximately 82 × 64 × 69 in
  • Chamber weightApproximately 1,433 lb
  • Custom optionsColor, logo, electric seat, star-effect ceiling, and ambient lighting
Gold cylindrical hard-shell monoplace chamber with transparent front door and separate control unit

Gold cylindrical monoplace chamber with a round transparent front door, a control panel on the right side, and a separate control box.

MACY-PAN Hard-Shell Monoplace Chamber

This hard-shell monoplace format places one user in a cylindrical chamber with a transparent front door. The side-mounted control panel and separate control unit support external operation. Ask for the current model designation and technical sheet so the quotation identifies the exact pressure, dimensions, materials, breathing-gas arrangement, electrical requirements, and included control equipment.

  • StructureCylindrical hard shell
  • CapacityOne user
  • Entry and visibilityRound transparent front door
  • Control arrangement shownChamber-side panel and separate control unit
  • Model-specific pressure, dimensions, materials, and oxygen configurationConfirmed in the written quotation
White horizontal MACY-PAN chamber with separate stretcher bed

White horizontal chamber with a separate stretcher bed aligned with the chamber opening; confirm the final product appearance and configuration in the current quotation.

MACY-PAN MC750 TPU Stretcher-Style Soft Chamber

The current MC750 product page describes a horizontal soft chamber made from composite TPU and paired with a sliding stretcher system. This format supports a lying position and moves the mattress platform along aluminum-alloy rails for entry and exit.

  • StructureComposite TPU soft chamber
  • Working-pressure rangeAdjustable from 1.3 to 1.5 ATA
  • Chamber dimensions225 cm long × 75 cm diameter, approximately 89 × 30 in
  • Stretcher configurationAluminum-alloy sliding rails with memory-foam mattress
  • Oxygen flow10 L/min
  • Oxygen purity93% ±3%
  • Rated power600 W
  • Electrical options110 or 220 V
  • Final appearance and supplied configurationConfirm in the current written quotation before approval
Gray MACY-PAN HE5000 hard-shell chamber with side door and control screen

Gray MACY-PAN HE5000 chamber with a side entry door, observation window, and external control screen.

MACY-PAN HE5000 Three-Person Hard-Shell Chamber — Gray Configuration

This gray HE5000 configuration uses the same multi-person chamber platform with selectable seating, bed-platform, or bench layouts. The finish can be coordinated with the facility design while the project team confirms the rated occupancy, pressure, controls, breathing-gas interfaces, and installation package in the quotation.

  • StructureHard-shell, medical-grade stainless steel
  • Available layoutsTwo seats, three seats, bed platform, or bench
  • Pressure specification2.0 ATA
  • External dimensionsApproximately 82 × 64 × 69 in
  • Chamber weightApproximately 1,433 lb
  • Custom optionsColor, logo, electric seat, star-effect ceiling, and ambient lighting

Confirm the Site Before You Approve the Configuration

Site approval should use the complete installed system, including the chamber, control unit, compressor, oxygen equipment, cooling or air-conditioning equipment, hoses, electrical connections, operator position, and maintenance access.

Delivery path and room layout

Measure every door, corridor, elevator, stair, turn, and threshold between unloading and the final room. Compare those measurements with the packaged dimensions and the installation sequence. Inside the room, reserve space for the door swing or stretcher movement, operator observation, emergency access, cleaning, filter service, ventilation, and removal of major components.

Floor and utilities

Confirm the chamber’s empty weight, system weight, operating weight, point loads, and required load distribution with the facility team. Match the quoted voltage, frequency, plug or hard-wiring method, grounding, circuit capacity, ventilation, temperature, humidity, and any external gas or oxygen connections to the site.

Fire safety and emergency access

The facility’s fire strategy must reflect the exact chamber, pressurizing medium, breathing-gas system, occupancy, room, and local requirements. Keep ignition sources and unapproved electrical items out of the controlled area, maintain clear exit routes, and define communication, power-loss, emergency depressurization, and evacuation procedures before operation.

Documents for site approval

Request an installation drawing, utility schedule, equipment list, floor-load data, service-clearance drawing, electrical requirements, ventilation requirements, and the manufacturer’s installation instructions for the quoted model. Use the final approved configuration for the site review because accessories and customization can change the footprint and utility demand.

Request Site-Planning Documents

Design the Daily Operating Plan

Commercial suitability depends on the planned workload and operating controls for the exact model. Ask the supplier to state the rated duty conditions, pressurization and depressurization times, ventilation or cooling requirements, inspection intervals, and maintenance windows for your proposed schedule.

Build a realistic session schedule

Calculate daily capacity from the full cycle: user preparation, entry or transfer, pressurization, the planned session, depressurization, exit, cleaning, inspection, and reset. A multi-person chamber adds capacity only when demand, staffing, oxygen interfaces, and the approved layout support simultaneous occupancy.

Assign trained operating roles

Define who screens the user under the facility’s service protocol, operates the system, monitors the occupant, responds to alarms, controls entry items, records each cycle, and coordinates an emergency. Training should cover the quoted controls, communication system, routine checks, pressure equalization instructions, power-loss response, manual release, and shutdown procedure.

Plan cleaning and preventive maintenance

Use cleaning products and methods approved for the chamber materials, seals, windows, upholstery, masks, hoses, and electronics. Place routine cleaning, filter work, seal inspection, valve checks, communication checks, calibration, and preventive maintenance on a documented schedule. Keep service records linked to the chamber model and serial number.

Prepare for downtime

Identify critical spare parts, normal replenishment time, remote-support hours, local service options, and the process for returning a failed component. A commercial schedule should include maintenance capacity and a response plan for alarms, leaks, damaged seals, unusual odors, abnormal noise, or control faults.

Discuss Your Planned Workload

Compare the Full Quote, Not the Chamber Price Alone

A useful commercial quote identifies the exact model and configuration, then separates included equipment, optional items, logistics, site work, training, and support. Request every supplier’s quote on the same basis.

Equipment and configuration

The quote should state the chamber model, pressure definitions, structure, rated occupancy, interior layout, chamber and system dimensions, weights, air and oxygen flow, controls, monitoring, communication, safety devices, electrical version, finish, accessories, and consumables. Ask the supplier to distinguish standard equipment from priced options.

Documents and verification

Include the technical specification, configuration list, drawings, labels, instructions for use, installation requirements, maintenance plan, test records, acceptance criteria, and the documents needed for the target market. Any certificate or authorization should identify its holder, scope, covered model, manufacturing location, issue date, expiration date, and current status.

Delivery and services

State the production lead time, factory acceptance point, packing, shipping term, freight, insurance, customs responsibilities, import roles, delivery location, unloading, positioning, installation, commissioning, operator training, maintenance training, and final acceptance. A promised ship date becomes meaningful when the design inputs, approvals, payment milestones, and shipping scope are defined.

Lifecycle cost

Budget for site preparation, power, oxygen-related equipment or supplies, ventilation or cooling, labor, cleaning materials, filters, inspections, calibration, preventive maintenance, spare parts, insurance, compliance work, and planned downtime. Commercial revenue and payback depend on service price, utilization, operating days, staffing, maintenance, and local operating requirements; calculate them separately from the equipment price.

Request an Itemized Quote

Verify the Manufacturer, Evidence, and Handover

The 2026 MACY-PAN product catalog reports 19 years of hyperbaric chamber industry experience and supply to more than 123 countries and regions. Use those company-level facts as the start of due diligence, then connect every specification, authorization, test record, and service commitment to the legal entity and exact model in the quotation.

Confirm the legal and supply-chain roles

Match the manufacturer, brand owner, exporter, seller, contract party, payment recipient, importer, installer, trainer, and service provider to the quotation and contract. Ask for a written explanation when the names on the equipment label, instructions, regulatory record, certificate, quotation, and payment account differ.

Check evidence against the exact model

Review the model’s intended use, target-market authorization, pressure-vessel basis, electrical requirements, labels, instructions, test records, and certificate scope. For a U.S. medical-device project, search the FDA record using the manufacturer, device name, model range, 510(k) number, and product code CBF, and confirm the foreign manufacturer and initial-importer responsibilities for the shipment.

Define factory and site acceptance

Agree on inspections and tests before production is released, then connect the results to the finished unit by model and serial number. The acceptance plan can include configuration verification, visual inspection, control and alarm checks, communication checks, pressure and leak testing, safety-device checks, document review, witnessed testing, punch-list closure, installation verification, and operator training.

Put continuing support in writing

The contract should state the warranty start date, covered parts and labor, exclusions, remote-support channel, response targets, on-site service conditions, travel costs, recommended spares, spare-part lead times, software support, and support for discontinued components. Complete handover with final drawings, manuals, test records, training records, maintenance schedule, spare-parts list, and service contacts.

Contact the ManufacturerRequest a Documentation Package

Commercial Hyperbaric Chamber FAQs

Can one chamber configuration serve both medical and wellness programs?

The intended use, labeling, operating instructions, target-market authorization, facility requirements, and professional oversight must support each planned program. Define the service before selecting the model; a business cannot extend a chamber into another use solely by changing its marketing description.

Which chamber type supports the highest daily capacity?

Capacity depends on rated occupancy and the complete cycle time for preparation, pressurization, the planned session, depressurization, exit, cleaning, and inspection. A multi-person chamber can increase users per cycle, while a monoplace unit may simplify individual scheduling. Compare both against real demand and staffing.

Can MACY-PAN customize a chamber for my brand or facility?

Shanghai Baobang offers OEM and ODM services and can customize color, logo, and product language. Selected soft-shell models can include red-light options; selected hard-shell lines offer model-specific control-panel or interior options. The quotation should identify each custom feature and its effect on price, lead time, documentation, and installation.

How is the final price calculated?

The system boundary causes many apparent price differences. One quote may cover only the chamber body, while another includes controls, compressor, oxygen equipment, cooling, accessories, testing, packing, and training. Mark every item as included, optional, supplied by the buyer, or excluded before comparing totals.

How long does delivery take?

Set the lead-time clock to a named written milestone, such as receipt of the deposit and approval of the final configuration drawing. The schedule should show how late approvals or scope changes move the factory-release date; a duration without a defined start point cannot support the facility opening plan.

What should a U.S. buyer verify before ordering?

Verify the specific model’s intended use and FDA status, the manufacturer and model shown in the regulatory record, product code CBF where applicable, current recall information, labels and instructions, electrical and fire requirements, and the foreign-manufacturer and initial-importer roles. State and local facility, professional, insurance, and operating requirements also apply to the planned service.

What installation information should I send with an inquiry?

Incomplete site data limits the supplier to a preliminary selection and budgetary quote. Final model approval should wait for a checked delivery route, room layout, floor-load review, utilities, ventilation, fire-safety conditions, and required service clearances.

What after-sales terms should be included in the contract?

Write response targets as measurable events: acknowledgment, remote diagnostic session, corrective plan, parts dispatch, escalation, and on-site attendance when included. Assign a time to each event by fault severity and state which time zone, business hours, costs, and customer access requirements apply.

Request a Commercial Hyperbaric Chamber Recommendation

Send your project details for a matched MACY-PAN configuration and itemized quotation.

  • Phone: 0086-180-1702-3916
  • Email: rachel@macypan.com
  • WhatsApp: 0086-180-1702-3916
  • Address: Bldg.15, 889 Guinan Rd, Songjiang Dist, Shanghai, China 201617

Include the planned service, target market, chamber format, users per session, access method, site dimensions, quantity, customization, delivery location, and target date.

U.S. Subsidiary’s Warehouse USA Local Technical Support
*
*

Your Country

*
Submitting!
Submission successful!
Submission failed!
Incorrect email address!
Incorrect phone number!

Find Right Hbot Chamber For You

U.S. Subsidiary’s Warehouse USA Local Technical Support

Tell us what you need. We’ll recommend suitable models, pricing and delivery options.

*
*

Shipping to:

USACanadaOthers
Submitting!
Submission successful!
Submission failed!
Invalid email address!
Incorrect phone number!

This will close in 0 seconds